| Route |
Contributor |
Last Updated |
Where |
Distance |
Tags |
|
(90) GGB TB NR CF PR ST |
iambabo |
Sep 22nd 2009, 07:21 |
|
144.6km |
|
| GGB start. Reverse Tib Loop via Strawberry, Nicasio Ranch, Cheese Factory, down to Pt Reyes Station, thru Sam P Taylor Park, Fairfax, Camino Alto, up Ft Baker |
|
My San Francisco Lunch Ride |
ddunavet |
Sep 14th 2009, 06:40 |
|
49.3km |
- Recreational
- Intermediate
- High traffic
|
| Sunset, Ocean Beach, Sea Cliff, Golden Gate Bridge, Marian Greens, through North Point St to Embarcadero - > Downtown, ATT Park, On the ride back through Golden Gate Park |
|
Golden Gate Scenic Route |
dabylon |
Sep 13th 2009, 10:22 |
|
67.6km |
|
| Starts in the Presidio, makes a loop around Golden Gate Park, returns through Presidio, over the GGB through the Marin Headlands, with a latte stop at Cafe Trieste in Sausalito, returning to Sports Basement via the Headlands. |
|
SF City Loop |
jpf |
Sep 13th 2009, 05:10 |
|
46.1km |
|
| Embarcadero via Townsend, then coastal loop to Lake Merced; home through Balboa Terrace |
|
Pedaling around the Presidio |
timob9797 |
Sep 13th 2009, 04:51 |
|
22.9km |
|
|
Paradise loop from Sunset |
ddunavet |
Sep 14th 2009, 06:41 |
|
51km |
- Training
- Intermediate
- Scenic
- Touring
|
| San Francisco, Golden Gate Park, Golden Gate Bridge, Tiburon, etc... |
|
Lunch in Nicasio |
Jim. |
Sep 11th 2009, 07:10 |
|
110.1km |
- Onroad
- Intermediate
- Urban
- Rural
- Scenic
|
| What you do after going to Kaiser Terra Linda |
|
Penninsula Classic Loop |
sf_danno |
Sep 9th 2009, 05:01 |
|
145.2km |
|
| San Francisco - Wiggle - GG Park - Great Highway - Highway 1 - Tunitas Creek - Old La Honda - Canada Rd - Skyline |
|
That Hard Presidio Route |
gayathri |
Sep 9th 2009, 06:37 |
|
15.3km |
- Recreational
- Intermediate
- Urban
- Scenic
|
|
sfsu to downtown |
smusmani |
Sep 9th 2009, 02:10 |
|
12.3km |
- Commute
- Onroad
- Difficult
- Rough
|
|
San Francisco via Skyline to Half Moon Bay, back by HW1 |
jjcommodius |
Sep 8th 2009, 02:39 |
|
110.7km |
|
|
Golden Gate Bridge |
GISonn |
Sep 2nd 2009, 07:49 |
|
14km |
- Recreational
- Onroad
- Smooth
- Basic
- High traffic
- Urban
- Scenic
|
| North Beach to Sausalito. Ferry ride back to SF. |
|
ATT park to Sausalito via Marin Headland |
m.nguyen001 |
Aug 30th 2009, 04:38 |
|
43.9km |
- Recreational
- Onroad
- Smooth
- Intermediate
- Scenic
- Touring
|
|
headlands/paradise loop |
kcowling |
Aug 30th 2009, 03:42 |
|
82.3km |
|
|
San Francisco Loop behind Twin Peaks |
tfortin |
Aug 29th 2009, 02:09 |
|
23.6km |
|
|
Marin Headlands to Stinson Beach Via Panoramic Hwy (by BuenosAires) |
BuenosAires |
Sep 4th 2010, 08:05 |
|
28.4km |
- Smooth
- Intermediate
- Low traffic
- High traffic
- Safe
- Unsafe
- Rural
- Scenic
|
| Ride to Stinson Beach from Gold Gate bridge. Pass through redwoods and over west ridge of Mt Tam. Optional visit to Muir Woods. Can be very hot in summer. This is the fast but not so safe route. Traffic on Hwy-1 can be heavy during commute hours and weekends. There is no bike path and no shoulder on Hwy-1 but the rest of the ride is much more quiet. Safe and quiet route is to take Miller Ave -> Throckmorton -> Cascade (Old Mill Park) -> Molino -> Birch -> Edgwood -> Panoramic Hwy. Start in Northwest parking lot Golden Gate Bridge. The fast route into Suasalito is shown. The Scenic route is to take Bike Path 5 under the Golden Gate Bridge and through the park. |
|
Golden Gate Bridge to Muir Beach (by BuenosAires) |
BuenosAires |
Sep 4th 2010, 07:28 |
|
17.9km |
- Recreational
- Onroad
- Smooth
- Intermediate
- Low traffic
- High traffic
- Safe
- Unsafe
- Scenic
|
| Ride to Muir Beach via HWY-1 from parking area on north side of Golden Gate bridge. More difficult than it looks. Traffic on Hwy-1 can be heavy during commute hours and weekends. There is no bike path and no shoulder on Hwy-1. |
|
24aug2009 cl ride |
chaley |
Aug 25th 2009, 05:41 |
|
17.7km |
- Recreational
- Onroad
- Smooth
- Steep
- Basic
- Low traffic
- Safe
- Urban
- Scenic
|
|
Golden Gate Bridge to Mt. Tamalpais (by BuenosAires) |
BuenosAires |
Feb 8th 2011, 04:35 |
|
29.7km |
- Recreational
- Onroad
- Smooth
- Steep
- Difficult
- Low traffic
- Safe
- Rural
- Scenic
|
| Climb to top of Mt. Tam (Mt. Tam). Ride through redwoods. Optional visit to Muir Woods. Can be very hot in summer. Parking lot GG Bridge north west. Divide Elevation Profile numbers by two. The fast route into Suasalito is shown. The Scenic route is to take Bike Path 5 under the Golden Gate Bridge and through the park. |
|
San Francisco to Sam's Restaurant |
CutterStark |
Aug 25th 2009, 05:26 |
|
35.7km |
|
| San Francisco Financial District to Sam's Restaurant in Tiburon, CA |
|
Diamond Heights to 2nd Street |
motogsxr |
Aug 24th 2009, 05:33 |
|
7.7km |
|
|
sports basement san bruno |
bosticman |
Aug 22nd 2009, 08:17 |
|
28.2km |
|
| sports basement to san bruno mt. |
|
GGBridge/Point Reyes Lighthouse |
mainexileinsf |
Aug 21st 2009, 03:36 |
|
170.6km |
- Recreational
- Training
- Onroad
- Intermediate
- Difficult
- Low traffic
- High traffic
- Urban
- Rural
- Scenic
|
|
Sports Basement Presidio, GGB, Sausalito, Corte Madera, Tiburon |
eaohanlon |
Aug 20th 2009, 10:39 |
|
45km |
- Recreational
- Onroad
- Smooth
- Intermediate
- Scenic
|
|
Suggested Route SF To LA |
nickaster |
Aug 18th 2009, 01:38 |
|
777.8km |
|
| This is still underdevelopment. Any comments appreciated! |
|
Architecture + the City: Second Bay Traditions Bicycle Tour |
dbarchitect |
Sep 19th 2010, 07:03 |
|
23.1km |
|
| Gear up and join architects David Baker and Robin Levitt and planner Rob Bregoff for a guided hilly ride to the city's most spectacular post-earthquake homes. Part of September's Architecture + the City Festival, this ride benefits AIA San Francisco and the San Francisco Bicycle Coalition.
The tour will focus on notable modern residential architecture outside of San Francisco’s downtown core. It will look at works by Second Bay Area Tradition architects and contemporaries, including buildings by Richard Neutra, William Wurster, Gardner Dailey, Henry Hill, Joseph Eichler and Anshen + Allen. Part of a rich architectural tradition, these buildings are also a feature of our everyday landscape.
Total biking time is about four hours. The ride will cover 20 miles, including hilly terrain. Riders must provide their own bicycle (low-gearing recommended) and wear comfortable clothing with layers and a helmet. The tour will stop for lunch at the appropriate time (lunch not included). |
|
Lower Haight to Marina Blvd. in Brisbane |
joshuakaufman |
Sep 3rd 2009, 10:39 |
|
17.5km |
|
|
Golden Gate Loop |
sand3r |
Aug 5th 2009, 06:35 |
|
13km |
|
|
San Francisco to Larkspur |
John Howes |
Aug 4th 2009, 06:54 |
|
32.5km |
- Recreational
- Onroad
- Intermediate
- Scenic
|
| City College of San Francisco to Larkspur |
|
GGB-Point Reyes Lighthouse |
mainexileinsf |
Aug 1st 2009, 10:14 |
|
171.7km |
- Recreational
- Training
- Onroad
- Intermediate
- Difficult
- Urban
- Rural
- Scenic
|