| Route |
Contributor |
Last Updated |
Where |
Distance |
Tags |
|
Hillegass Workout |
charlie_benton |
Sep 10th 2008, 03:39 |
|
24.9km |
|
| Ride we take from our house for an hour of good workin'! |
|
IBStoABS |
kanthaka4runner |
Feb 1st 2012, 07:26 |
|
178km |
- Recreational
- Intermediate
- Low traffic
- Rural
- Scenic
- Touring
|
|
Indian Rock Run |
jules.ucb |
Nov 6th 2008, 06:12 |
|
6.1km |
|
| running loop |
|
Inspiration Point out & back |
wozzz |
Jun 4th 2009, 09:14 |
|
15km |
|
| A North Berkeley quickie to Inspriation Point |
|
Inspiration Point out & back |
wozzz |
Jun 4th 2009, 09:15 |
|
15km |
|
| quickie |
|
Jason's up tunnel down Claremont |
ahituna |
Jul 15th 2010, 01:48 |
|
25.7km |
|
|
Jimmy Beans to Cole Coffee |
jeremylatrasse |
Dec 27th 2008, 02:03 |
|
18.7km |
- Recreational
- Training
- Onroad
- Smooth
- Intermediate
- Difficult
- Low traffic
- Scenic
|
| Via Virginia, Euclid, Grizzly Peak, Centennial, and Claremont. |
|
Kensington to Moraga Via Gizzly Pk |
tracyclay |
Mar 30th 2008, 10:01 |
|
42.9km |
- Steep
- Low traffic
- Rough
- Scenic
|
| Grizzly Peak, Skyline, Redwood, Pinehurst to Moraga and back up Pinehurst climb then back the way we came |
|
Lafayette Loop |
musacchj |
Apr 18th 2010, 01:14 |
|
61.4km |
|
|
Lafayette Tilden Wild Cat |
yuanja888 |
Nov 9th 2007, 12:00 |
|
62.8km |
- Recreational
- Training
- Touring
|
|
Lomas Contadas from Berkeley Through Tilden |
sinican |
Nov 10th 2008, 11:21 |
|
33.2km |
- Recreational
- Training
- Onroad
- Steep
- Difficult
- Scenic
|
| hilly ride from downtown Berkeley |
|
Long Day on the Bay |
smratalleck |
Jun 23rd 2009, 06:49 |
|
253.8km |
|
|
Long Point Richmond Loop |
tamalpais |
Nov 4th 2008, 12:01 |
|
50km |
- Recreational
- Smooth
- Low traffic
- Urban
- Scenic
|
| Yet another section of Bay Trail; flat except for a few overpasses and one short climb. |
|
Los Angeles/Oxford - Senior |
yirg.kenya |
Sep 2nd 2009, 11:01 |
|
5.7km |
|
|
Megan's Tunnel - Grizzly - Euclid - Claremont - Loopty Doop |
rinaldi_berkeley |
Jun 18th 2008, 05:48 |
|
32.1km |
- Recreational
- Onroad
- Steep
- Intermediate
- Low traffic
- High traffic
- Safe
- Scenic
|
| Hill training with fast descents |
|
Michigan Grizzly Peak, Skyline, Pinehurst Berkeley Hills Loop |
sinican |
Apr 8th 2009, 06:50 |
|
54.7km |
- Recreational
- Training
- Onroad
- Steep
- Intermediate
- Rural
- Scenic
|
|
Morata/lake |
burkesss |
Sep 6th 2010, 06:14 |
|
94.8km |
|
|
Mount Diablo via Papa Bear |
apezda |
Jun 13th 2009, 06:03 |
|
88.7km |
- Recreational
- Onroad
- Difficult
- Urban
- Rural
- Scenic
|
|
Mt Diablo via Tunnel/Return via Pinehurst |
JulesUCB |
Apr 7th 2008, 06:18 |
|
138.9km |
- Steep
- Intermediate
- Urban
- Rural
|
| Appox. 90 mis. |
|
Mt. Hamilton via Mines Road |
JulesUCB |
Mar 28th 2008, 05:48 |
|
131.4km |
- Training
- Steep
- Difficult
- Urban
- Rural
- Scenic
|
| Dublin/Pleasanton BART to San Jose (via Mine Rd/Mt. Hamilton) |
|
N. Berkeley BART to Berkeley Marina (via Gilman St) |
moooster |
Sep 9th 2006, 05:21 |
|
5km |
|
|
N. Berkeley BART to Point Richmond loop |
pedalergal |
Jan 5th 2009, 03:45 |
|
25.8km |
- Recreational
- Onroad
- Offroad
- Low traffic
- Urban
- Scenic
|
| Mostly flat mix of scenery along the Bay Trail and Richmond Marina, plus industrial/shipping areas in Richmond, with many choices for a lunch stop in Point Richmond. The ride has some small hills (all avoidable with detours) and a nice jaunt through the tunnel and Miller-Knox Regional Shoreline park in Richmond on the return trip. Appropriate for both road bikes and mtn bikes with wider tires. (some patchy pavement, wooden pier surfaces and RR crossings). Round trip is approximately 32.5 miles |
|
N.Berkeley BART - Castro Ranch Rd - Alhambra Vly Rd - Reliez Vly Rd - Lafayette - Orinda - Berkeley Hilly Route |
pedalergal |
Jan 16th 2009, 07:18 |
|
74.1km |
- Recreational
- Training
- Onroad
- Intermediate
- Urban
- Rural
- Scenic
- Touring
|
| Flat through Albany, El Cerrito, El Sobrante to SPDR; Castro Ranch to Alhambra Valley Road, Pig Farm Hill the Steep Way, Reliez Valley Road to Lafayette, Deer Hill and Happy Valley Road and back to El Nido Ranch Road, St. Stephens Trail to Orinda (lunch), then back out Camino Pablo to Wildcat, up and over through Tilden, down Spruce Street to Berkeley. |
|
Nifty 10 50 |
JulesUCB |
Apr 25th 2009, 03:37 |
|
97km |
- Steep
- Difficult
- Urban
- Scenic
|
|
No. Berkeley BART To Bay Trail via Bike Bridge |
Amber Evans |
Mar 19th 2008, 02:19 |
|
3.5km |
- Recreational
- Onroad
- Low traffic
- Urban
- Scenic
|
|
North Berkeley BART - Spruce, Wildcat, Bears (backwards), Dam Road, Wildcat and back down Spruce |
pedalergal |
Jan 20th 2009, 07:08 |
|
60.2km |
- Recreational
- Training
- Onroad
- Smooth
- Intermediate
- Urban
- Rural
- Scenic
|
| Your basic hilly bears loop from Berkeley, counterclockwise. (Note: optional detour to lunch in Orinda adds about 5 miles, all flat) |
|
North Berkeley BART West Contra Costa hills loop to Orinda BART |
pedalergal |
Jan 14th 2009, 12:51 |
|
81.7km |
- Recreational
- Onroad
- Steep
- Urban
- Rural
- Scenic
- Touring
|
|
North Berkeley BART West Contra Costa hills loop with Castro Ranch Road and Wildcat |
pedalergal |
Jan 9th 2009, 06:24 |
|
97.7km |
- Recreational
- Training
- Onroad
- Steep
- Intermediate
- Urban
- Rural
- Scenic
- Touring
|
| This is what the orginal route would look like |
|
North Berkeley Hills with views and a workout |
oren |
Jun 8th 2006, 05:48 |
|
0km |
|
|
North Berkeley to Point Molate in Richmond & return |
gvernea1 |
Aug 29th 2011, 06:11 |
|
32.4km |
- Recreational
- Training
- Smooth
- Intermediate
- Urban
- Scenic
- Touring
|
| Double mileage for round trip, 40.2 mi. |