| Route |
Contributor |
Last Updated |
Where |
Distance |
Tags |
|
Centennial and South Park from Downtown Berkeley |
sinican |
Nov 10th 2008, 11:09 |
|
20.9km |
- Recreational
- Training
- Difficult
|
| two death hill in one |
|
Lomas Contadas from Berkeley Through Tilden |
sinican |
Nov 10th 2008, 11:21 |
|
33.2km |
- Recreational
- Training
- Onroad
- Steep
- Difficult
- Scenic
|
| hilly ride from downtown Berkeley |
|
Panoramic way loop |
jules.ucb |
Nov 13th 2008, 06:57 |
|
13km |
|
|
Berk to Alameda thru Oaklands Shoreline Park |
djdelon |
Nov 15th 2008, 09:29 |
|
38.4km |
|
|
Centenial El Toyanal |
ccramer |
Nov 16th 2008, 08:57 |
|
11.9km |
- Training
- Steep
- Low traffic
- Scenic
|
|
Tunnel-Joaquin Miller - Ascot |
jules.ucb |
Nov 17th 2008, 04:19 |
|
41.6km |
|
|
Berkeley Hills Training |
jamesshuang |
Nov 19th 2008, 04:01 |
|
17.7km |
- Training
- Onroad
- Intermediate
- High traffic
- Scenic
|
|
Berkeley-Diablo-MT-Hamilton-San Jose (w/Sierra) |
JulesUCB |
Dec 22nd 2008, 12:22 |
|
284.8km |
- Recreational
- Training
- Difficult
- Urban
- Rural
- Scenic
- Touring
|
| return via amtrak. Devil-Mt. Double training (planned for March) |
|
Berkeley to Pleasanton |
JulesUCB |
Dec 24th 2008, 09:26 |
|
153.9km |
- Intermediate
- Urban
- Rural
- Scenic
|
| via San Jose and Sierra Rd climb |
|
Jimmy Beans to Cole Coffee |
jeremylatrasse |
Dec 27th 2008, 02:03 |
|
18.7km |
- Recreational
- Training
- Onroad
- Smooth
- Intermediate
- Difficult
- Low traffic
- Scenic
|
| Via Virginia, Euclid, Grizzly Peak, Centennial, and Claremont. |
|
N. Berkeley BART to Point Richmond loop |
pedalergal |
Jan 5th 2009, 03:45 |
|
25.8km |
- Recreational
- Onroad
- Offroad
- Low traffic
- Urban
- Scenic
|
| Mostly flat mix of scenery along the Bay Trail and Richmond Marina, plus industrial/shipping areas in Richmond, with many choices for a lunch stop in Point Richmond. The ride has some small hills (all avoidable with detours) and a nice jaunt through the tunnel and Miller-Knox Regional Shoreline park in Richmond on the return trip. Appropriate for both road bikes and mtn bikes with wider tires. (some patchy pavement, wooden pier surfaces and RR crossings). Round trip is approximately 32.5 miles |
|
North Berkeley BART West Contra Costa hills loop with Castro Ranch Road and Wildcat |
pedalergal |
Jan 9th 2009, 06:24 |
|
97.7km |
- Recreational
- Training
- Onroad
- Steep
- Intermediate
- Urban
- Rural
- Scenic
- Touring
|
| This is what the orginal route would look like |
|
home loop |
rotomonkey |
Jan 10th 2009, 11:51 |
|
32.8km |
|
|
North Berkeley BART West Contra Costa hills loop to Orinda BART |
pedalergal |
Jan 14th 2009, 12:51 |
|
81.7km |
- Recreational
- Onroad
- Steep
- Urban
- Rural
- Scenic
- Touring
|
|
Redwood/Skyline Loop |
bhighbiker |
Jan 16th 2009, 02:52 |
|
71km |
- Training
- Onroad
- Difficult
- Scenic
|
| My alternative to the popular Fruitstand Ride. A little more climbing but less miles and the roads are quieter. |
|
N.Berkeley BART - Castro Ranch Rd - Alhambra Vly Rd - Reliez Vly Rd - Lafayette - Orinda - Berkeley Hilly Route |
pedalergal |
Jan 16th 2009, 07:18 |
|
74.1km |
- Recreational
- Training
- Onroad
- Intermediate
- Urban
- Rural
- Scenic
- Touring
|
| Flat through Albany, El Cerrito, El Sobrante to SPDR; Castro Ranch to Alhambra Valley Road, Pig Farm Hill the Steep Way, Reliez Valley Road to Lafayette, Deer Hill and Happy Valley Road and back to El Nido Ranch Road, St. Stephens Trail to Orinda (lunch), then back out Camino Pablo to Wildcat, up and over through Tilden, down Spruce Street to Berkeley. |
|
Tunnel - Grizzly - Wildcat - Pinehurst loop |
testa |
Jan 16th 2009, 10:22 |
|
63.4km |
|
|
Berkeley & Moraga Through Happy Valley |
sinican |
Jan 17th 2009, 12:01 |
|
59km |
- Recreational
- Training
- Onroad
- Intermediate
- Rural
- Scenic
|
|
North Berkeley BART - Spruce, Wildcat, Bears (backwards), Dam Road, Wildcat and back down Spruce |
pedalergal |
Jan 20th 2009, 07:08 |
|
60.2km |
- Recreational
- Training
- Onroad
- Smooth
- Intermediate
- Urban
- Rural
- Scenic
|
| Your basic hilly bears loop from Berkeley, counterclockwise. (Note: optional detour to lunch in Orinda adds about 5 miles, all flat) |
|
Pittsburg BART to Sacto |
JulesUCB |
Jan 29th 2009, 07:22 |
|
100.2km |
|
| delta/valley route |
|
Berkeley Hills by Oxford |
sinican |
Feb 5th 2009, 06:58 |
|
21.2km |
- Recreational
- Training
- Onroad
- Smooth
- Steep
- Scenic
|
| by oxford, san diego, south hampton, santa barbara, florida, colorado, and michigan and back to Spruce again |
|
Berkeley to Castro Valley |
powpow |
Feb 6th 2009, 04:42 |
|
74.7km |
- Training
- Onroad
- Intermediate
- Scenic
|
| Berkeley>Tunnel>Skyine>Redwood>Turn around in Castro Valley>Redwood>Pinehurst>Skyline>Tunnel>Berkeley |
|
Berkeley to Moraga via Pump House and Happy Valley |
sinican |
Feb 9th 2009, 03:04 |
|
64.4km |
- Recreational
- Training
- Onroad
- Smooth
- Steep
- Intermediate
- Rural
- Scenic
|
|
Ohlone Ride |
stajich |
Feb 9th 2009, 03:43 |
|
13.4km |
- Recreational
- Intermediate
- Low traffic
- Urban
|
| Follow the ohlone Trail |
|
El Toyanal climb |
mrpedal |
Feb 15th 2009, 12:05 |
|
5km |
|
| 3.1 miles, 1712ft of elevation = avg 10.5% grade |
|
Diablo/MT/Redwood Loop |
JulesUCB |
Feb 20th 2009, 05:51 |
|
209km |
- Recreational
- Training
- Difficult
- Scenic
- Touring
|
| Double Training Ride |
|
pinehurst from house |
rotomonkey |
Mar 1st 2009, 12:55 |
|
47.3km |
|
|
A&K Saturday Ride |
powpow |
Mar 1st 2009, 01:10 |
|
72.3km |
- Training
- Onroad
- Difficult
- Rural
|
| 45 miles with 5000 vert.
Climbs: Papa Bear west side, Happy Valley, Redwood>Skyline, Snake, Grizzly Peak |
|
Coventry climb |
powpow |
Mar 4th 2009, 01:41 |
|
1.5km |
|
| 1 mile, 394 vert |
|
Berkeley - Oakand Zoo Loop |
himgan |
Mar 13th 2009, 05:53 |
|
73.5km |
|