| Route |
Contributor |
Last Updated |
Where |
Distance |
Tags |
|
15 mile Danville Loop |
sherrick |
Sep 17th 2008, 03:36 |
|
24km |
|
|
Aptos-Corralitos loop |
sherrick |
Jan 19th 2009, 04:53 |
|
51km |
|
| Some beautiful back roads through Redwoods and horse pastures. |
|
Athenian-Sunol-Collier Canyon Loop |
sherrick |
Sep 14th 2008, 04:35 |
|
87.5km |
|
| Nice mostly flat ride. No hard climbs. |
|
Bears/GzyPk/Redwood/Collier Canyon |
sherrick |
Jul 30th 2008, 07:02 |
|
165.1km |
|
| Century with views of S.F. and the bay, challenging climbs, and nice back roads. |
|
Bears/GzyPk/Skyline/Redwood/Palomares |
sherrick |
Jul 30th 2008, 05:57 |
|
155.4km |
|
| Century with a good dose of climbing, (6K CEG.) Views of S.F. and the bay. |
|
D.C. Oakland Zoo Loop |
sherrick |
Apr 27th 2009, 07:04 |
|
99.5km |
- Recreational
- Onroad
- Difficult
- Scenic
|
| Mirrors much of the afternoon loop of the Grizzly Peak Century |
|
Dublin to Sierra Rd |
sherrick |
Feb 2nd 2009, 04:32 |
|
100.1km |
- Recreational
- Onroad
- Difficult
|
|
Fairfax-Bolinas Loop |
sherrick |
Jul 1st 2008, 05:52 |
|
77.1km |
|
| Beautiful Marin ride from San Anselmo over the hills to Rt 1, north and back again. |
|
Felton-Zayante-Bear Creek Loop |
sherrick |
Nov 2nd 2008, 12:22 |
|
44km |
- Recreational
- Onroad
- Intermediate
- Scenic
|
|
Grizzly Peak-Skyline Loop |
sherrick |
Jul 30th 2008, 05:14 |
|
91.6km |
|
| Diablo Cyclists ride around East Bay. Great views of S.F. and Bay. Challenging hills. |
|
Guerneville-Skaggs Springs Loop |
sherrick |
Jul 25th 2008, 09:12 |
|
167.7km |
- Onroad
- Difficult
- Rural
- Scenic
|
| 100 miler. |
|
Healdsburg-Skaggs Springs-Jenner 2 Day Loop, Day 1 |
sherrick |
Jul 25th 2008, 07:38 |
|
121km |
- Onroad
- Difficult
- Rural
- Scenic
|
| First day of a two-day loop. Beautiful roads, ocean view, long and challenging climbs. |
|
Healdsburg-Skaggs Springs-Jenner Two-Day Loop, Day Two |
sherrick |
Jul 25th 2008, 08:26 |
|
108.4km |
- Onroad
- Intermediate
- Rural
- Scenic
|
| Second Day of a 150 mile loop. |
|
Jay's Ride Metric Century |
sherrick |
Sep 9th 2008, 06:14 |
|
97.5km |
- Onroad
- Difficult
- Rural
- Scenic
|
| Metric Century through some gorgeous back roads. Beautiful scenery. 5,000' CEG |
|
Junction Loop from South Gate |
sherrick |
Aug 1st 2008, 06:07 |
|
46.7km |
|
| Nice loop over shoulder of Mt Diablo. Beautiful views. |
|
Kentfield, Nicasio, Pt Reyes, Panoramic, Mill Valley |
sherrick |
Nov 11th 2008, 01:52 |
|
90.6km |
- Recreational
- Onroad
- Intermediate
- Scenic
|
| Beautiful ride through Marin County, including a nice stretch down Hwy 1 and a challenging, but not too difficult climb up Mt. Tam. |
|
Kings Mtn-Skyline-Page Mill Loop |
sherrick |
Jan 12th 2009, 01:26 |
|
82.3km |
|
|
Martinez to Davis |
sherrick |
Aug 8th 2008, 05:15 |
|
130.1km |
|
| One way ride. Take the Amtrak back to start.Lots of scenic roads, and not a lot of climbing. |
|
Millbrae-Old La Honda-Santa Cruz |
sherrick |
Nov 29th 2008, 12:16 |
|
121.1km |
- Recreational
- Onroad
- Difficult
- Scenic
|
| One way trip to Santa Cruz. Beautiful views of ocean, some challenging hills. |
|
Mines Road to Hamilton Summit OAB |
sherrick |
May 5th 2009, 04:05 |
|
152.1km |
- Recreational
- Onroad
- Steep
- Difficult
- Low traffic
- Rural
- Scenic
|
|
Mines Road to Mt Hamilton |
sherrick |
Aug 5th 2008, 05:56 |
|
76.5km |
- Onroad
- Steep
- Difficult
- Low traffic
- Rural
- Scenic
|
| Tough ride up the back side of Mt Hamilton. Very remote and steep. |
|
Mines Road to San Antonio Junction |
sherrick |
Aug 5th 2008, 05:44 |
|
47km |
|
| Out and back along very quiet and remote road. Resupplying can be a problem. Don't plan to arrive at the junction before 11am. |
|
Mines Road to San Antonio Junction OAB |
sherrick |
Mar 17th 2009, 11:16 |
|
93.5km |
|
|
Moraga to Athenian, over Mt. Diablo |
sherrick |
Jan 21st 2009, 04:33 |
|
41.9km |
|
|
Mt Hamilton Challenge Clockwise |
sherrick |
May 5th 2009, 04:16 |
|
165.6km |
- Recreational
- Onroad
- Steep
- Difficult
- Low traffic
- Rural
- Scenic
|
|
Oakville, Lake Berryessa, Ink Grade Loop |
sherrick |
Mar 9th 2009, 02:13 |
|
98.6km |
|
|
Petaluma-Freestone-Tomales Bakery Ride |
sherrick |
Apr 28th 2009, 05:25 |
|
118km |
- Recreational
- Onroad
- Difficult
- Scenic
|
|
Point Reyes Lighthouse from Nicasio, OAB. |
sherrick |
May 17th 2009, 12:38 |
|
97.1km |
- Recreational
- Onroad
- Intermediate
- Low traffic
- Rural
- Scenic
|
| 60 mile total round trip, "Out and Back" to the Point Reyes Lighthouse from Nicasio. |
|
SF to Marin starter route |
sherrick |
Aug 5th 2008, 05:08 |
|
11.5km |
- Onroad
- High traffic
- Urban
- Scenic
|
| Beginning of any ride from SF Ferry Building over GG Bridge |
|
SF to Mill Valley |
sherrick |
Aug 5th 2008, 05:24 |
|
20.7km |
|
| San Francisco, over Golden Gate Bridge to Mill Valley. |