| Route |
Contributor |
Last Updated |
Where |
Distance |
Tags |
|
William and Kent St Sydney |
pauljohnson |
Sep 10th 2006, 01:56 |
|
8.5km |
- Onroad
- Smooth
- High traffic
- Urban
|
|
proposed_RTA_bike_route_16-08-2006_Bexley North_to_Turrella |
pauljohnson |
Nov 18th 2006, 12:08 |
|
3.8km |
|
|
DOES_NOT_EXIST_a_route_the_RTA_proposed_Bexley_North_to_Turrella |
pauljohnson |
Nov 18th 2006, 12:30 |
|
2.9km |
- Commute
- Recreational
- Smooth
- Offroad
- Low traffic
- Urban
|
|
proposed_route_Sydney_Body_Art_Ride_2007 |
pauljohnson |
Feb 8th 2007, 01:13 |
|
6.4km |
- Recreational
- Onroad
- Basic
- Urban
- Scenic
|
|
Scone Excuse 2 (50km route) |
pauljohnson |
Apr 1st 2007, 04:30 |
|
50.5km |
- Recreational
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
- Scenic
|
|
Riverwood to Westleigh |
pauljohnson |
Apr 6th 2007, 06:51 |
|
30.2km |
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
|
|
Scone Excuse 3 (49km route) |
pauljohnson |
Jun 9th 2007, 10:20 |
|
48.9km |
- Recreational
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
- Scenic
|
|
Scone Excuse 1 (46km route) |
pauljohnson |
Feb 10th 2008, 04:36 |
|
46km |
- Recreational
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
|
| This ride is just an excuse to go to Elizabeth Farm for coffee and scones. |
|
proposed RTA route Feb 2007 M5East path to Cooks River path |
pauljohnson |
May 25th 2008, 09:35 |
|
4.3km |
- Onroad
- Offroad
- Low traffic
- Urban
|
| This maps out the latest RTA proposal to link the eastern end of the M5East to...anything. It a cop out, and is largely an already existing Canterbury Council route. |
|
Backpedalling William St (proposed route into city only) |
pauljohnson |
Jul 23rd 2008, 12:02 |
|
27.3km |
- Recreational
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
- Scenic
|
| This was the route for the July 30 2006 ride to William St. Cyclists assembled 9:00am opposite NSW Premier Morris Iemmas office of his electorate at 48 Thurlow St, Riverwood. Ride left 9:30am sharp.
NSW Premier Iemma is also the Member for Lakemba. Cyclists travelled from his office at Riverwood to William St, Kings Cross, to let him know we didn't want cycle lanes removed as a result of the Cross City Tunnel fiasco. Ride returned by a similar route. Since the route was originally drawn in mid 2006, Google Maps have more detailed satellite images, I'm currently editing the route to be more accurate. |
|
Dunc Gray Velodrome to Padstow, Salt Pan Creek |
pauljohnson |
Apr 15th 2009, 05:15 |
|
10.6km |
- Recreational
- Onroad
- Low traffic
- High traffic
- Urban
|
| Dunc Gray Velodrome to Cutting Reserve at Padstow, to meet the Salt Pan Creek path. Mostly quiet back streets, just a few short bits of main road to cycle flat out on. |
|
Kogarah2Turrella slow route |
pauljohnson |
Apr 18th 2009, 03:28 |
|
7.9km |
- Recreational
- Onroad
- Offroad
- Low traffic
- Urban
|
|
Strathfield2RiverwoodviaPunchbowl |
pauljohnson |
Apr 18th 2009, 03:38 |
|
8km |
- Onroad
- Low traffic
- High traffic
- Urban
|
|
Rhodes2Riverwood1 |
pauljohnson |
Apr 18th 2009, 04:21 |
|
15.7km |
- Onroad
- Smooth
- Low traffic
- High traffic
- Urban
|
|
Beverly Hills to Campsie |
pauljohnson |
May 2nd 2009, 03:13 |
|
6.5km |
- Commute
- Onroad
- Smooth
- Low traffic
- High traffic
- Safe
- Urban
|
| Beverly Hills to Campsie via some of the quieter streets, M5East path, then more on-road past Canterbury Hospital. |
|
Riverwood shops to Revesby shops 2 |
pauljohnson |
Jul 18th 2009, 11:11 |
|
4.2km |
- Commute
- Recreational
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
- Scenic
|
| Mostly quiet streets and some boardwalk across Salt Pan Creek to get from Riverwood shops to Revesby shops. |
|
Riverwood to Chipping Norton commute 1 |
pauljohnson |
Jul 19th 2009, 02:22 |
|
9km |
- Commute
- Onroad
- High traffic
|
| Fast early morning commute from Riverwood to Chipping Norton via M5, The River Rd, Milperra Rd, Milperra Bridge, Rickard Rd and Arthur St. |
|
Sydney_Body_Art_Ride_2009 |
pauljohnson |
Sep 20th 2009, 06:21 |
|
6.4km |
- Recreational
- Onroad
- Smooth
- Basic
- Low traffic
- Urban
- Scenic
|
| Route for the Sydney Body Art Ride 2009 (same route as the 2007 ride). See the website for more details:
http://www.sydneybodyartride.org/
|
|
Chipping Norton to Riverwood commute 2 |
pauljohnson |
Oct 17th 2009, 07:58 |
|
10.8km |
- Commute
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
|
| Commute from Chipping Norton to Riverwood via Arthur St, Milperra Bridge, Henry Lawson Dr, Bullecourt Ave, Carringston St, M5, Salt Pan Creek boardwalks, Riverwood lake. |
|
Chipping Norton to Riverwood commute 3 |
pauljohnson |
Dec 12th 2009, 08:45 |
|
10.8km |
- Commute
- Recreational
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
|
| Commute from Chipping Norton to Riverwood via Arthur St, Milperra Bridge, Henry Lawson Dr, Bullecourt Ave, Beaconsfield St, Doyle Rd, Padstow, Salt Pan Creek. |
|
Riverwood to Chipping Norton commute 2 |
pauljohnson |
Dec 12th 2009, 08:47 |
|
10.4km |
- Commute
- Onroad
- High traffic
- Urban
|
| Commute from Riverwood to Chipping Norton via M5, The River Rd, Beaconsfield St, Horsley Rd, Bullecourt Ave, Henry Lawson Drive, Milperra Bridge and Arthur St. |
|
Padstow to Surry Hills 1 |
pauljohnson |
Dec 12th 2009, 10:45 |
|
21.7km |
- Commute
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
|
| Padstow to Surry Hills via Bryant St, Salt Pan Creek, Riverwood lake, M5 path, M5East path, Cooks River path, Marrickville, Erskineville, Wilson St, Redfern, Prince Alfred Park. |
|
Padstow to Surry Hills 2 |
pauljohnson |
Dec 12th 2009, 10:50 |
|
22.3km |
- Commute
- Recreational
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
|
| Padstow to Surry Hills via Padstow Station, Bridge St, Salt Pan Creek, M5East paths, Cooks River path, Marrickville, Newtown, Wilson St, Redfern, Prince Alfred Park. |
|
Chipping Norton to Riverwood commute 1 |
pauljohnson |
Dec 12th 2009, 10:52 |
|
10.8km |
- Commute
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
|
| Commute from Chipping Norton to Riverwood via Arthur St, Milperra Bridge, Henry Lawson Dr, Bullecourt Ave, Beaconsfield St, Doyle Rd, Padstow shops, Salt Pan Creek.. Please note, part of the Salt Pan Creek boardwalk this route uses will be closed till approx 2011 for the K2RQ project. |
|
Kirrawee2RiverwoodViaAlfordsPointBridge |
pauljohnson |
Jan 24th 2010, 03:53 |
|
17.2km |
- Onroad
- Steep
- Offroad
- Low traffic
- High traffic
- Urban
|
| Kirrawee to Riverwood via Alfords Point Bridge. Much of the route on pathways or back streets but there are a couple of horror sections of unfriendly main road. The Alfords Point Bridge duplication is finished, though this route does not use the new path. |
|
Kirrawee to Riverwood via Como |
pauljohnson |
Apr 20th 2010, 12:54 |
|
13.1km |
- Onroad
- Smooth
- Offroad
- Low traffic
- High traffic
- Urban
- Scenic
|
| Kirrawee to Riverwood via the Como bridge pathway across Georges River. Mostly onroad it avoids the worst of the main roads. Please note at the end of the route, the Webb St underpass at Riverwood is temporarily closed for the K2RQ construction, 20/04/10 to 25/04/10. Detour is via Belmore Rd South, William Rd, Henry Rd and Lillian Rd. |
|
cent2bi |
pauljohnson |
Aug 15th 2010, 12:50 |
|
28.2km |
- Recreational
- Onroad
- Smooth
- Offroad
- Safe
- Urban
- Scenic
|
| Centennial Park to Bicentennial Park, via Rosebery, Coward St, Mascot, Alexandra Canal path, Tempe, Cooks River path. |
|
Tempe-Campsie-Bankstown |
pauljohnson |
Aug 15th 2010, 12:58 |
|
15.3km |
- Commute
- Recreational
- Onroad
- Offroad
- Low traffic
- High traffic
- Urban
- Scenic
|
| Tempe to Bankstown via Cooks River path to Canterbury, then never more than a couple of blocks from the railway Campsie to Bankstown. |
|
Panania Station to Milperra Rd. |
pauljohnson |
Aug 15th 2010, 01:26 |
|
3.1km |
- Onroad
- Smooth
- Basic
- Offroad
- Low traffic
- Urban
|
| From Panania Station to Milperra Rd near Bunnings, via mostly quiet streets and Killara Reserve. |
|
Riverwood to Mascot 1 |
pauljohnson |
Oct 17th 2010, 11:47 |
|
15.9km |
- Commute
- Onroad
- Low traffic
- High traffic
- Urban
|
| Commute from Riverwood to Mascot mostly along pathways and back streets. A couple of short sections of busy road. Via Hannans Rd, Broadarrow Rd, M5East paths, Wolli Ave, Earlwood, Gough Whitlam Park, Tempe, and Alexandra Canal path. |