The way points of this bicycle route:
Entrance to Prospect Park at GAP
Grand Army Plaza entrance to Prospect Park. There are benches.
Take a right onto 6th Street
Entering 3rd ave high traffic
Street contruction going on. may need to walk bikes a block or two on temporary sidewalk
Bike path on 3rd St
Bridge over Gowanis cannal
Clinton St bike path
Pretty brownstones on this st
Bike path heading to the Brooklyn Bridge
Go under the Manhattan Bridge, bike path entrance on right
Donut Plant on Grand St
Bathrooms and benches
Industrial Williamsburg
New City Park on the water's edge
Left onto Norman Ave, becomes Wythe
Hasidic neighborhood
Bed-Stuy
Crown Heights
Finish, back at Prospect Park