The way points of this bicycle route:
Prom restriction needs lifting...
Toucan Crossing Required here.
Cycling Restriction should be lifted.
Toucan Crossing required here
Cycle path needs laying here
Toucan Crossing across Worthing Road Required.
Entrance/Exit to A259 and posible NCR2 at thia point.
This needs some change because the road width is insufficient for a car, and cycle to pass
Used as a meeting gound for the Town Fair etc.
Toucan Crossing required here
Cycling to be permitted along this route to the Beach and Arun Pde.
Welcome to Bikely, take a step by step tour of this path:
Press Start Tour - then use the navigation buttons below to move along the path.
Cycling is not currently is not permitted throughout this route, but with some small additional work would allow some great connections from the residential areas to the Town saefront, ans Swimming centre.
It's a wonderfully simple way to get children onto cycles, and to experience our great parks and recreation areas.
Tagged with: Recreational